Rearrange Project Tasks

Getting Started Step 19. After you’ve added tasks to a Project List, you can easily rearrange them using drag & drop.
01.06.2023

Getting Started

Step 19

Rearrange Project Tasks Using Drag & Drop

After you’ve added tasks to a Project List, you can easily rearrange them using drag & drop.

When rearranging Project tasks, keep in mind that you can have nested levels of Project tasks. Each task level will be indented slightly, and thus will have an effect on where you will want to drop your Project task. You need to place the Project task between two tasks, but you will also need to be precise as to which task level (left to right) to drop it in.

Additionally, you can drop your Project task into another Project task (a parent task).

The way you rearrange a Project task will vary slightly depending on if you are using an iPhone, iPad, a Trackpad on a Mac, or a mouse on a Mac.

Rearranging a Project Task on an iPhone, iPad, or Trackpad:

1. Press and hold the Project task you would like to move.

2. Without lifting your finger, drag the Project task to the new location. The Project task can be placed:

a. between two existing Project tasks

b. into an existing Project task (the incoming Project task will be placed as the last Project task within the parent Project task)

c. above the first Project task within a parent Project task

d. below the last Project task within a parent Project task

3. Lift your finger off the Project task and the Project task will drop into the new location.

Rearranging a Project task on a Mac, using your mouse:

1. Click and hold the Project task you would like to move.

2. Without lifting your finger off the mouse, drag the Project task to the new location. See #2 above for different options where you can drop a Project task.

3. Lift your finger off the mouse, and the Project task will drop into the new location.

Important Note:

A parent Project task can contain other Project tasks (sub-tasks). When rearranging a parent Project task, all of the Project tasks within it will be included in the move. You will see them appear to “roll up” within the parent Project task as you are moving it.

The video below will show how to rearrange Project tasks on an iPad.

Subscribe To The Blog

Related Posts

Additional Information

Currently, the links in the sections below are not available. We will be adding more documentation articles and videos, as well as blog posts, throughout 2023 and beyond.

Popular Articles

Check out these popular blog posts & articles:

Article 1

Article 2

Article 3

Article 4

Article 5

Blog Post Topics

Check out these blog post topics:

Announcements

New Features

FAQ

How To Articles

IdeasToDone

Productivity

Productivity Methods

Documentation Topics

Check out these documentation topics:

Getting Started

Tutorials

FAQ

What’s New

Inboxes

Projects

Focus View

Task Calendar

Dashboards

Templates

Organizers

Settings

Tasks

Multi-Edit

Recurring Tasks

Edit Task

Available on The App Store Now!

IdeasToDone Premium - $2.99 per Month or $29.99 per Year
1-Month Free Trial, Risk-Free

Download It Today!